Kettering General Hospital NHS Foundation Trust has published this notice through Delta eSourcing
Notice Summary |
---|
Title: | UK-Kettering: Infrastructure works consultancy services. |
Notice type: | Modification Notice |
Authority: | Kettering General Hospital NHS Foundation Trust |
Nature of contract: | Services |
Procedure: | Award without prior publication |
Short Description: | The provision of a Whole Site Energy Solution Solution to Include: High Voltage and Standby Power Systems Design and Associated Utilities (lead consultant or project manager led Ancillary Services for the development and approval of an Whole Site Energy Solution for the redevelopment of Kettering General Hospital) |
Published: | 22/11/2023 08:52 |
View Full Notice
This notice is covered by: Directive 2014/23/EU
Section I: Contracting authority/entity
I.1) Name and addresses
Kettering General Hospital NHS Foundation Trust
Rothwell Road, Kettering, NN16 8UZ, United Kingdom
Tel. +44 1536491708, Email: gail.thorburn@nhs.net
Contact: Gail Thorburn
Main Address: https://www.kgh.nhs.uk
NUTS Code: UKF2
Section II: Object
II.1) Scope of the procurement
II.1.1) Title: Whole Site Energy Solution to include: - High Voltage and Standby Power Systems Design and Associated Utilities
Reference number: 604817255
II.1.2) Main CPV code:
71311300 - Infrastructure works consultancy services.
II.1.3) Type of contract: SERVICES
II.2) Description
II.2.1) Title: Contract Variations Whole Site Energy Solution to include: - High Voltage and Standby Power Systems Design and Associated Utilities
Lot No: Not Provided
II.2.2) Additional CPV codes:
Not Provided
II.2.3) Place of performance:
UKF2 Leicestershire, Rutland and Northamptonshire
II.2.4) Description of the procurement at the time of conclusion of the contract:
Contract variations - The provision of a Whole Site Energy Solution to include: High voltage and standby power systems design and associated utilities (project manager led Ancillary Services for the development and approval of an Whole Site Energy Solution for the redevelopment of Kettering General Hospital which takes into consideration wider health system.)
II.2.7) Duration of the contract, framework agreement, dynamic purchasing system or concession
Duration in months: 36
II.2.13) Information about European Union funds:
The procurement is related to a project and/or programme financed by European Union funds: No
Section IV: Procedure
IV.2) Administrative information
IV.2.1) Contract award notice concerning this contract
Notice number in OJ S: Not Provided
Section V: Award of contract/concession
Contract No: EE10888 Lot No: Not Provided Title: Contract variations Whole Site Energy Solution to include: - High Voltage and Standby Power Systems Design and Associated Utilities
V.2) Award of contract/concession
V.2.1) Date of conclusion of the contract/concession award decision: 04/10/2021
V.2.2) Information about tenders
The contract has been awarded to a group of economic operators: No
V.2.3) Name and address of the contractor/concessionaire, No. 1:
Aecom Ltd, 01846493
Aldgate Tower, 2 Leman Street, London, E1 8FA, United Kingdom
NUTS Code: UKI5
The contractor/concessionaire is an SME: No
V.2.4) Information on value of the contract/lot/concession:
Total value of the procurement: 315,220
Currency: GBP
Section VI: Complementary Information
VI.3) Additional Information:
Contract variations to orignial award Title: Whole Site Energy Solution to include: - High Voltage and Standby Power Systems Design and Associated Utilities Reference number: 604817255 Contract Variation HV Intake £ 70,897.00 Contract Variation Heat Load £ 62,970.00 Contract Varaition - Steam Boiler £ 52,000.00 Contract Variation UPS/IPS Feasibility £ 22,890.00 Contract Variation Estates Demolition £ 20,063.76 Contract Variation Electrical Load £ 10,490.00 Contract Variation Front Block Panel B £ 6,160.00 Contract Variation Arboricultural Survey£ 4,750.00 Contract Variation Progressing the HV Intake room design £ 65,000.00
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=825124609
VI.4) Procedures for review
VI.4.1) Review Body
Kettering General Hospital NHs Foundation Trust
Rothwell Road, Kettering, United Kingdom
V1.4.2) Body responsible for mediation procedures:
Not Provided
VI.4.3) Review procedure
Not Provided
VI.4.4) Service from which information about the review procedure may be obtained
Not Provided
VI.5) Date of dispatch of this notice: 22/11/2023
Section VII: Modifications to the contract/concession
VII.1) Description of the procurement after the modifications
VII.1.1) Main CPV code:
71311300 - Infrastructure works consultancy services.
VII.1.2) Additional CPV code(s)
Not Provided
VII.1.3) Place of performance:
UKF2 Leicestershire, Rutland and Northamptonshire
VII.1.4) Description of the procurement:
Contract Variations HV Intake£ 70,897.00 Heat Load£ 62,970.00 Steam Boiler£ 52,000.00 UPS/IPS Feasibility£ 22,890.00 Estates Demolition £ 20,063.76 Electrical Load£ 10,490.00 Front Block Panel B£ 6,160.00 Arboricultural Survey£ 4,750.00 Progressing the HV Intake room design £65,000.00
VII.1.5) Duration of the contract, framework agreement, dynamic purchasing system or concession:
Duration in months: 36
.
VII.1.6) Information on value of the contract/lot/concession
Total value of the contract/lot/concession: 315,220.76
Currency: GBP
The contract has been awarded to a group of economic operators: No
VII.1.7) Name and address of the contractor/concessionaire, No. 1:
Aecom Ltd,, 01846493
Aldgate Tower, 2 Leman Street, London, E1 8FA, United Kingdom
NUTS Code: UKI5
The contractor/concessionaire is an SME: No
VII.2) Information about modifications
VII.2.1) Description of the modifications:
Contract Variations HV Intake£ 70,897.00 Heat Load£ 62,970.00 Steam Boiler£ 52,000.00 UPS/IPS Feasibility£ 22,890.00 Estates Demolition £ 20,063.76 Electrical Load£ 10,490.00 Front Block Panel B£ 6,160.00 Arboricultural Survey£ 4,750.00 Progressing the HV Intake room design £65,000.00
VII.2.2) Reasons for modification:
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Continuation of services that are all connected to The provision of a Whole Site Energy Solution to include: High voltage and standby power systems design and associated utilities (project manager led Ancillary Services for the development and approval of an Whole Site Energy Solution for the redevelopment of Kettering General Hospital which takes into consideration wider health system.)
VII.2.3) Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in
the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 1,212,143
Currency: GBP
Total contract value after the modifications:
Value excluding VAT: 1,212,143
Currency: GBP